Project Portfolio
Ongoing Projects

Construction of Eight Lane access-controlled Expressway carriageway from Ranni Village to Miyati Village of Jhabua (Ch. 652+720 to 673+770; Design Ch. 200+300 to 22 I +3S0) section of Delhi — Vadodara Greenfield Alignment (NH-I 48N) on EPC Mode under Bharat Mala Pari yojana in the State of Madhya Pradesh (Package 24)
Description of Work:
30 no’s Minor Bridges, 09 no’s Major Bridges, Pretension Girder (1270 Nos), Precast Plank (13698 no’s), Precast beam (4119 no’s), Open Foundation (256nos) , Pier (256nos) , Pier cap (256 no’s) , Girder erection , Deck Slab (198 no’s) all Activities
Fabrication:
Including Formwork Design and Fabrication work

Construction of flyover bridge at Bhopal square to Indira Gandhi Square on old Indore Bhopal Road at Dewas district in the state of Madhya Pradesh Project
Description of Work:
Length of Bridge – 1.65 Km. Pile, Pile cap, Pier, Pier cap, Girder erection, Deck Slab, Crash Barrier, and Expansion Joints all Activities

Construction of Eight Lane Access Controlled Expressway from KM 26.582 To KM 50.700 of Main Expressway and KM 0+0 To KM 3+000 of Spur (Shirzad to Mavan section of Vadodara Mumbai expressway) in the state of Maharashtra on Hybrid Annuity Mode Under Bharat Mala Pari yojana (Phase II - Package XIII)
Description of Work
Segment Casting (1386 Nos.), Segment Launching (66 no’s Span)
Fabrication:
Including Precast Segment Formwork Design and Fabrication work

Construction of Four Lane Elevated Road as part of under construction Ganga Path (Digha to Deedarganj) from Dulli Ghat to Nuruddin Ghat ,from Dharamshala Ghat to Old NH-30along with connectivity to Ashok Rajpath at Kangan Ghat and Patna Ghat with allied facilities at Patna in the State of Bihar on EPC Mode.
Description of Work:
Segment Casting (1104 Nos.), Segment Launching (69 no’s Span)
Fabrication:
Including Precast Segment Formwork Design and Fabrication work

Tolling, operation, maintenance, and transfer of Palanpur-Radhanpur-Samkhiyali section of nh-27 from km 589+500 to km 536+000 in the state of Gujarat (tot bundle 5a1)
Description of Work:
Pile, Pile cap, Pier, Pier cap, Post Tension Girder, Deck Slab all Activities.
Ongoing Projects

Construction of 6-Laning of NH-2, From Prayagraj Bypass to Varanasi (Handia-Varanasi Section)
Description of Work:
5 no’s Elevated Structure (total 9.069 Km) Spine and Wing Segmental Super Structure, launching activity, Pile, Pile cap, Pier, Pier cap all Activities
Fabrication:
Including Formwork Design and Fabrication work

Construction of Elevated Metro Rail Stations - Six (6) Numbers Including Viaduct Portion Within the Stations and Transition Spans on Either Side of the Stations (Vastral Gam, Nirant Cross Road, Vastral, Rabari Colony, Amraiwadi and Apparel Park) on Reach-1 of East-West Corridor for Ahmedabad Metro Rail Project Phase-I
Description of Work:
Pre-Tension, Post Tension Girders, Pile, Pile cap, Pier, Portal at Concourse Level, Platform and Track Level with Erection of Girder all Activity etc
Fabrication:
Including Formwork Design and Fabrication work

Construction of Eight Lane access-controlled Expressway carriageway from Ranni Village to Miyati Village of Jhabua (Ch. 652+720 to 673+770; Design Ch. 200+300 to 22 I +3S0) section of Delhi — Vadodara Greenfield Alignment (NH-I 48N) on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh (Package 24)
Description of Work:
14 no’s Minor Bridges, 15 no’s Major Bridges, Pretension Girder (798 Nos), Precast Plank (10140 no’s), Precast beam (1712 no’s), Open Foundation, Pier, Pier cap, Girder erection, Deck Slab all Activities
Fabrication:
Including Formwork Design and Fabrication work

Improvement and Upgradation of Highway starting from Junction with NH-44 at Panipat connecting Kairana, Shamli, Muzaffarnagar, Mirapir, Bijnor and Terminating at Its Junction with NH-74 At Kotwali to two/four lane with paved shoulder configuration-Panipat to Shamli Pk-1 of NH-709D.
Description of Work:
14 no’s Minor Bridges, 15 no’s Major Bridges, Pretension Girder (798 Nos), Precast Plank (10140 no’s), Precast beam (1712 no’s), Open Foundation, Pier, Pier cap, Girder erection, Deck Slab all Activities
Fabrication:
Including Formwork Design and Fabrication work

Construction of Fly Over Bridge on Kataragama Main Road at Surat
Description of Work:
Length of Bridges 1.75 KM with Pre-Tension Girder, PSC Box Girder, Pile Foundation, Pier, Pier cap, Deck Slab, Solid Slab, Crash Barrier, Expansion Joint Fixing with all other activities.
Fabrication:
Including Formwork Design and Fabrication work

Area Development, Construction of Flyover & Public Space at IIM Junction, AMC, Ahmedabad
Description of Work
PSC Box Girder with Pile Foundation
Fabrication:
Including Precast Segment Formwork Design and Fabrication work

Construction of New Bridges/Structure, Repair of Existing Four Lane Highway from Baleshwar to Kharagpur Section of NH 60 (Km 45+000 to Km 119+300 in the state of Orissa and West Bengal and its Operation and Maintenance Under NHDP Phase 1 to be Executed as BOT (Toll) on DBFOT Pattern.
Description of Work:
Major Bridges & Minor Bridges, Culverts, VUP, Pile all type of activities.
Fabrication:
Including Formwork Design and Fabrication work

Four Lanning of Hazaribagh - Ranchi, Section of NH-33 in the State of Jharkhand on BOT (Annuity) Basis.
Description of Work:
Major and Minor Bridges PSC I Girder with Open Foundation and RCC T-Girder Super-Structure
Fabrication:
Including Formwork Design and Fabrication work

Re-habitation and upgrading at Radhanpur- Deesa Section of NH-14 in the state of Gujarat.
Description of Work
PSC Box Girder Bridge on Banas River with Well Foundation, Grade Separator, ROB, Box Culvers, Pipe Culvers Etc.
Fabrication:
Including Precast Segment Formwork Design and Fabrication work

Construction of Grade Separator at Dabri Intersection of Phankha Road with Road Leading to Dwarka, New Delhi- 110058.
Description of Work:
Precast Segment casting in casting yard, Precast Box- Drain segment casting at yard of 12 metres &10 metres. Wide drain with L & T – Shape segment, Pile, Pile cap, Pier, Pier cap all activities.
Fabrication:
Including Formwork Design and Fabrication work