Four-Laning & Bridge Construction – Baleshwar
to Kharagpur Section, NH-60 (Orissa & West Bengal)

Project Snapshot

Location:    Baleshwar (Orissa) to Kharagpur (West Bengal), NH-60

 

Project Type:    Four-Lane Highway Upgrade with New Bridges & Structures (BOT – DBFOT)

 

Chainage:    Km 45+000 to Km 119+300

 

Scope Includes:    Construction of major & minor bridges, culverts, VUPs, pile foundations, repair of existing highway, and all allied works

 

Fabrication:    Formwork design, precast fabrication, and erection

Project Overview

This project involved the four-laning and repair of NH-60 from Baleshwar to Kharagpur, executed under the BOT (Toll) – DBFOT model as part of NHDP Phase I.

 

The scope included construction of major and minor bridges, culverts, VUPs, and pile foundations, along with repair and strengthening of existing highway structures. Advanced formwork design and fabrication techniques ensured precision, quality, and timely completion.

Key Achievements

  • Construction of new major and minor bridges along the corridor

  • Execution of culverts, VUPs, and pile foundations for enhanced structural stability

  • Repair and strengthening of the existing four-lane highway

  • High-quality formwork design and fabrication enabling accurate and efficient construction

  • Project completed in compliance with NHAI and BOT safety and operational standards

Outcome

The completed Baleshwar–Kharagpur NH-60 section now provides enhanced traffic capacity, improved highway safety, and reliable infrastructure for interstate connectivity. The project highlights our firm’s capability in executing BOT-based highway projects with complex bridge and structural works.